Czajka Wastewater Treatment,
Warsaw, Poland

In the course of the EU directives on compliance with the EU wastewater standards, the construction of the Czajka large wastewater treatment plant in Warsaw constitutes one of the most important measures for environmental protection in Europe.

The Czajka Wastewater Treatment Plant, the biggest treatment plant in Poland, was constructed in 2011 in the north-east of the capital Warsaw and ever since it has substantially improved the water quality of the Vistula river and thus also of the Baltic Sea.

The extension and modernisation of this plant, which was designed for a population of roughly 2.1 million PE, has helped to more than double its previous capacity of 200,000 m³ per day with a daily intake of 450,000 m³ – increasing to a potential intake of 515,000 m³ per day at peak times.

The Czajka wastewater treatment plant purifies more than 435,000 m³ of wastewater every day – the equivalent of 25 tanker trucks a minute.

The consortium was made up of WTE Wassertechnik GmbH, Veolia Water (France) and the Polish construction company Warbud SA. In addition to designing and equipping the mechanical purification stage and also the wastewater pre-treatment, WTE was responsible for the sludge treatment in particular.

In late 2011, after three years of construction work, the Czajka wastewater treatment plant was successfully completed. The project was implemented in two stages so that operations could continue uninterrupted during the construction work.

 

Independent generation of electricity and heat from biogas.

The Czajka Wastewater Treatment Plant generates 192 t sewage sludge every day. The sludge is treated in four new and six refurbished digesters. The digester gas that is generated there is cleaned and desulphurised and stored in biogas tanks. The biogas is used directly to generate electricity and heat. The fermented and sterilised sludge is channelled into intermediate tanks. It is then mechanically dewatered. Lastly, it is fed to the sludge incineration plant.

The scope of delivery and services of WTE Wassertechnik GmbH included the feed pump station, the screening building, the sand trap, the preliminary clarification tank, the thickener, the digestion tower and the sludge treatment.

Use our strengths for your project.

Simply get in touch with us on:

Phone: +49 201 8968 500

Email: info@wte.de

You can also send us your enquiry using our contact form including a brief description of your requirements so that we can allocate your enquiry in the best possible way.

To protect against spam, we use a CAPTCHA for this contact form. We need your consent to use this. If you give your consent and wish to use the contact form, please open the cookie settings, and give your consent under "Other". Cookie-Einstellungen
Please fill out with * signed fields
* Mandatory fields